Rainy Days and Mondays…*

I never expected to have to work around rain delays when we started this project. Partly because this project began two years ago – smack dab in the middle of one of the worst droughts in our state’s history – but also because, droughts aside, summer in Texas is not known for its rain showers.

I like to think this project got the attention of the weather gods and since they have silly, mischievous senses of humor the lakes around North Texas filled up a bit while they inflicted rain upon our little project. You’re welcome. For the record, we will not be able to help out during the next drought. This is it for us.

The last storms that affected us directly happened when we were painting the outside of the house. Mark took a week off from work and two full days of painting were lost to rain. He figured out a way to salvage the time by building the framework for the fireplace himself (relatively easy work since he’s the one who designed it). Take that, weather gods!

We still have much to do with the fireplace, but the pictures at the end of this post will give you a good idea of how this thing will look.

In the beginning – father-in-law cipherin’ measurements very early on Day One of Project: Fireplace.

20140612_072137

Then the fun stuff starts!

20140612_105338

20140612_112034

20140612_114917

Disclaimer: No fathers-in-law were hurt during this construction.

20140612_115954

Mark works out the depth of the columns (real world applications are sometimes different from CAD drawings).

20140612_132843

Building the structure vertically.

20140612_142021

20140612_141925

Inspecting the work at the end of Day One.

WP_20140612_15_16_15_Pro

Day Two – it gets wrapped in OSB (Oriented Strand Board – not Oriental Strand Board) for strength…

WP_20140613_15_12_48_Pro

…and Mark sorts out brick placement and the width of mortar joints.

20140622_134542

By this point, the rain let up and we were able to return to our paint buckets.

Several weeks later, sheetrock went up and the concrete guys built a frame for the hearth (they were also on-site to build frames for steps outside the sliding doors and the front porch – but we’ll talk about those things in a future post).

20140710_070613

A couple of weeks after that, they poured the concrete.

20140715_143701

Around this time, the brick masons started their work on the outside of the house. They, too, felt the wrath of the weather gods, so they, too, moved indoors to work on the fireplace during rain (it’s important to reiterate that this is JULY IN TEXAS).

20140717_164548

20140717_170438

Instead of a pre-made firebox, the brick masons custom-built one to Mark’s specifications. We lovingly referred to the fireplace as the ‘pizza oven’ during this phase.

WP_20140718_16_55_04_Pro

Once they finished the firebox, Mark started his work on the placement of the cement board to hold the tiles that will eventually be the focus of the fireplace.

20140720_154530

Right around this time the plumbers ran a line for gas.

Side conversation: No, we don’t plan to use wood logs in this thing. It’s meant for decorative purposes 98% of the time. The other 2% – Thanksgiving and Christmas – should not be spent cleaning soot and ashes. Yes, we love wood fires and plan to have a proper fire pit outside, where homemade marshmallows stuffed on the ends of twigs can melt into sticky, stringy globs and water from the cement pond can thoroughly douse any burning embers.

Back to the plumbers – Mark was not happy with the location they chose for the cut-off valve. Please note it is now both lower and centered squarely on the corners of the bricks. I could dedicate a whole post to OCD tendencies.

20140724_174745

In case you’re wondering: Yes, that’s dirt on those bricks. They sat on-site for eleven months. I think they’re pretty clean considering.

Here’s a peek inside. I call this its Mullet Phase – you know, business in the front/party in the back. If you’re curious, the brick masons used the busted up pieces for fortification purposes.

20140724_175037

Work on the cement board fittings continued as Mark and his dad added braces followed by the board.

20140724_175030

20140724_180531

The masons then covered the “party” brick with “business” brick, effectively killing any links to the mullet/pizza oven.

IMGP2048

Here’s how it looks today. There’s still a lot of work to do – namely, we must make the ceramic tiles to fill the center. I’m looking forward to that part because we’ll work with our dear friend Keith Thomson from the Firehouse Gallery. We own some of his work already, but I like the idea that he will be a permanent part of this home.

IMGP2043

In closing, I give Mark my most heartfelt thanks for his infinite patience as I vacillated between we-must-have-a-mantle(!) and do-we-really-need-a-mantle(?!) exactly twenty times a day for the past fourteen months. The man is a saint.

* Blatant use of a Carpenters song seemed appropriate for this carpentry-heavy post.